Given our aviation industry roots we understand its complex and evolving operational challenges. With that knowledge we strive to be the architects of solutions which are not only cost effective but also current. The accomplishments outlined here represent a window into some of the global challenges we've resolved for the aviation industry, major oil and pipeline companies, a host of airlines and the chemical and oil refinery industries and their investors.  

Environmental Due Diligence

  • Provided Transaction Screening process and Phase One Site Assessments at 16 Canadian Airports. Sites included fuel facilities, into-plane fueling and de-icing operations.
  • Conducted Phase One Environmental Site Assessments for the seller of a network of Fixed Base Operators and Aircraft Maintenance Repair Facilities. Work included site visits and the preparation of Phase One ESA reports for the seller at 16 locations throughout Asia, Europe, the Middle East and the United States.
  • Completed a Phase One ESA of a pipeline fed bulk storage facility.
  • Conducted Appraisal and Phase One Inspections of a U.S. Air Force bulk storage plant and hydrant system.
  • Managed the acquisition team of 57 airport locations that include into-plane services.


Storage Tank Closures

  • Demolition and closure of an above-ground fuel system at Logan International Airport in Boston.
  • Demolition and closure of an above ground bulk storage system at Philadelphia International Airport. 
  • Removal of a multi-tank complex underground fuel system at Los Angeles International Airport.
  • Removal of a series of tanks discovered during demolition of a dated aircraft hangar complex at Chicago Midway Airport.
  • Removal of a multi-tank system at West Palm Beach International Airport.


Fuel System Design and Construction

  • Provided all project management services for the design, contractor bidding and selection, permitting and construction of a bulk storage facility in the LA County at Los Angeles International Airport.
  • Analyzed fuel storage needs, managed the bidding and contract processes for tank removals and construction of a new fuel facility at Jackson Hole Airport.
  • Managed upgrades to an existing bulk storage facility at Jacksonville International Airport. Modernization included new containment truck transfer pads, tank repairs and replacements and hardware upgrades.
  • Designed and built contract for state of the art fuel system at the general aviation facility in Philadelphia.

Compliance Projects


  • Prepared a comprehensive OSHA Aviation Services Complaince Manual for the NATA.
  • Conducted compliance evaluations for de-icing facilities at airports coast to coast.
  • Developed custom fuel system manuals including a template for a Fuel Facility O&M Manual for the ATA's Environmental Committee.
  • Conducted extensive research involving legal requirements for cargo operations as part of the ISO 14001 certification process.


 


 